Tours hybrides, BTS hors réseau et data centers edge exigent une alimentation fiable et maintenable. Voici comment LIYI les dimensionne.
Telecom sites in Africa run in some of the harshest conditions on earth: 45 °C ambient heat, a grid that drops for hours, and fuel that must travel long distances.
- Measure the real load, not the nameplate: base station plus cooling is often 60–80 % of the bill
- Size prime power at 80 % of the site peak, not standby rating
- Add an automatic transfer controller so the genset starts within seconds of a grid failure
- Budget for 7–14 days of fuel autonomy; alarmed remote tanks prevent silent outages
LIYI offers complete telecom power packages: silent canopy gensets, ATS, and optional hybrid battery/solar controllers — sized by our engineers from your load sheet.